KARACHI BUILDING & TOWN PLANNING
REGULATIONS (AMENDMENT) 2005
______________________________________________________________________
________________________________________________________________________
PART – I
KARACHI BUILDING CONTROL AUTHORITY
CITY
DISTRICT GOVERNMENT KARACHI
In exercise of the powers conferred by Section 21-A of Sindh Building Control Ordinance 1979, the Authority is pleased to make and promulgate the following Amendments in the existing Karachi Building & Town Planning Regulations-2002.
The following Amendments
made by the Authority under SBCO, 1979 are hereby published for general
information:-
These amendments shall be
called KARACHI BUILDING & TOWN PLANNING REGULATIONS (AMENDMENT) 2005.
|
S.No. |
REGULATIONS NO. |
AMENDMENTS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
1.
|
1-5 |
These Regulations
shall supercede the Karachi Building
and Town Planning
Regulations-1979. Notwithstanding the replacement of the Karachi Building & Town Planning Regulations-1979 by these Regulations as noted in Clause-(1-1.1) above hereinafter referred to as the said Regulations and Rules, any instruction issued, action taken, funds created or established, departmental inquires and proceedings initiated under the said Regulations and rules and in force immediately before commencement of these Regulations (Karachi Building & Town Planning Regulations-2002) shall be deemed to have been passed issued, established, initiated or made in these Regulations (Karachi Building &Town Planning Regulations-2002), as if these regulations were in force at the time of which such orders were passed, instructions issued, and made and shall continue to have effect accordingly. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
2.
|
Schedule 1A Concerned
Authorities |
Subject to the provisions of Chapter 1 of the Regulations, the following public agencies are designated as Concerned Authorities for the respective areas and purposes here indicated. The Concerned Authorities shall exercise powers assigned by these Regulations framed under the Ordinance and as amended from time to time. Schedule 1A-CONCERNED AUTHORITIES |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Sr. No. |
CONCERNED AUTHOR ITIES |
JURISDICTION |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
1 |
City District
Government |
All areas within its jurisdiction other than those
under the jurisdiction of other
public agencies listed here. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
2 |
Cantonment Boards of the
Ministry of Defence |
Areas of housing schemes, industrial estates or other
land under their respective jurisdiction in Karachi Division which are leased
to the Concerned Authority or developed by others. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
3 |
Karachi Port Trust |
Areas of housing schemes, industrial estates or other
land under its jurisdiction which are leased to or developed by others. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
4 |
Pakistan Railways |
Areas of housing schemes, industrial estates or other land
under its jurisdiction which are leased to or developed by others. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
5 |
Ministry of Works Government of Pakistan |
Areas of housing schemes, industrial estates or other land
under its jurisdiction which are leased to or developed by others. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
6 |
Sind Industrial Trading Estates Karachi |
Areas of housing schemes, industrial estates or other land
under its jurisdiction which are leased to or developed by others. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
7 |
Sindh Katchi Abadies Authority |
All areas within its jurisdiction other than those
under the jurisdiction of other public agencies listed here. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
8 |
Board of Revenue |
All areas within its jurisdiction other than those
under the jurisdiction of other public agencies listed here. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
3.
|
2-12.a |
“Architect” means
a person currently registered/enlisted as such with PCATP. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
4.
|
2.31 |
“CDGK” means City District
Government Karachi |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
5.
|
2-37 |
“Concerned
Authority” means the
public agency designated to perform the functions of the Concerned Authority for
the purpose of these Regulations (Schedule 1A) or any Concerned Authority
notified by the Government from time to time. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
6.
|
2-39 |
“COS –Compulsory
Open Space” means that part of a
plot which is to be left completely open to sky, over which no structure or
any integral part of the building shall be permitted except ramp upward,
permissible projections, basement including ramp , steps, septic under ground
tanks, soakpits, water reservoirs and lines for sewage, water, electricity,
gas, telephone etc., or those structures required by civic agencies such as
electric sub-station permitted elsewhere in these Regulations. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
7.
|
2-42 |
“Covered Area” same as Floor Area Regulation
2-55. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
8.
|
2-57 |
“Footprint” means the portion of a plot of
land covered, at any level, by a building or part thereof other than basement
and ramp upward / downward for parking. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
9.
|
2-66.a |
“Karachi
Division” means and includes the areas currently designated as
such in the administrative control of City District
Government Karachi and areas under the jurisdiction of concerned authorities
(as designated in schedule 1A) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
10.
|
2-76 |
"Loft" means
a horizontal slab used only for storage purposes, which shall be allowed in
kitchens, baths and store rooms/shops with access from inside only upto
5'-0" clear height between the loft floor and ceiling above. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
11.
|
2-86.a |
“PCATP” Means Pakistan Council of Architects &
Town Planners. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
12.
|
2-121.a |
“Town
Planner” means a person currently registered / enlisted as such with
PCATP. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
13.
|
2-122 |
“Transport
Department” means the Transport
Department of the City District Government Karachi. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
14.
|
Table 3.1 – Categories of Development Works |
CATEGORY - I |
a)
Bungalow on
plot up to 120Sq.yds (100.33Sq.m) b)
Any other
building on plot up to 120Sq yds. (100.33Sq.m)
with height up to 33ft.(10m) |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CATEGORY - II |
a) All bungalows b)
Any other
building with total floor area up to 20,000Sq.ft.(1858.74Sq.m) and/or height
up to 50ft.(15.2m), other than Category I & IV. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CATEGORY
- III |
All
buildings with total floor area greater than 20,000Sq.ft.(1858.74Sq.m) and/or
height greater than 50ft.(15.2m), other than Category IV. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CATEGORY
- IV |
Public use
buildings with total floor area more than 10,000Sq.ft. ( 929.36 Sq.m), buildings for essential
facilities, public sale buildings. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CATEGORY - V |
-
Town
Planning works and Land
development for area 2.5 acres (1 hectare) and greater. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
15.
|
Table
3.2 Procedure for Approval |
S. NO. |
CATEGORY |
PLAN SIGNED BY PROFESSIONAL |
APPROVAL
GRANTED |
|||||||||||||||||||||||||||||||||||||||||||||||||||||
|
1. |
I |
Building Designer Or Architect Or Professional Engineer
(Civil) Or Structural Engineer. |
(One Stage) Final Approval |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
2. |
II |
Architect and/or Structural Engineer * |
(One Stage) Final Approval |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
3. |
III |
Architect and Structural Engineer** |
(Two Stages) Architecture Approval Submission of structural design/drawing for record (and
vetting)**. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
4. |
IV |
Architect and Structural Engineer** |
(Two Stages) Architectural Approval Structural design and drawing duly vetted by Proof
Engineer. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
5 |
V |
Town Planner |
(One Stage) Final Approval. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
* Architect and Structural Engineer are both
required for residential bungalows on more than 400Sq.yds.(336Sq.m) plots. **
Structural vetting by a Proof Engineer is required for any building having a
height of more than ground plus four floors or 50ft.(15.2m) and/or total
floor area more than 1,00,000Sq.ft.(9,293.6Sq.m), and for structures of
special nature and unusual designs, such as
shells and folded plate systems, water towers and stack like
structures, apart from category III and IV buildings. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
16.
|
3-2.2.2 in line No.5 |
Word “should” to be read
“shall” |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
17.
|
3-2.2.3(a) |
Initially three sets and finally Six
sets of architectural working drawing/plans, at the time of initial submission,
by the owner and duly signed and stamped by the relevant Professional. The
drawings shall show Plans, Sections and Elevations of every floor, including
basement, of the building intended to be erected, which shall be drawn to a
scale of not less than 1:100 (1”=8’). If the building is so extensive as to
make a smaller scale necessary, it may be drawn to a smaller scale but not
less than 1:200(1”=16’). Such plans and
sections shall show
the purpose for which the
building or parts thereof
are intended to be used; the
access to and from
the several parts
of the building;
the position, dimensions,
means of ventilation, the proposed
height of the plinth and
superstructure at the level
of each floor, together with
the dimensions and descriptions of all the walls,
floors, roofs, staircases and elevator, etc. if any.
After architectural approval six sets of structural working drawings and two
sets of structural calculations shall be submitted for record duly signed by the
owner and stamped by Architect and Structural Engineer respectively. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
18.
|
3-2.2.3(b) in
line No.6 |
Word “performa” to be read “proforma” |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
19.
|
3-2.3 |
Corrections on
Plan. No corrections or overwriting shall be
permitted on plans submitted for approval or on plan finally approved by the
Authority. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
20.
|
3-2.4 |
Alteration of DesignIn case of category-1 category-II and category-III Buildings a) If the Owner/Professional intends to alter the design after grant of approval, such that there is no increase in floor area, change of open space/s or increase in height of buildings, no further submission or permission shall be required provided that the proposed changes do not violate any of the provisions of these Regulations. b)
In the event
that proposed alteration/s after grant of approval, involves increase in
floor area and / or change in open space/s and / or increase in height of
building, provided that the proposed changes do not violate any of the
provisions of these Regulations. the
Owner/Professional shall be required to submit a revised submission
plan. However during the period of processing of revised plan by the
authority construction may continue. c)
In case of
category-IV building If
at any time after grant of approval the Owner/Professional intends to alter
the design, the Owner/Professional shall be required to submit a revised
submission plan. During the period of processing
of revised plan by the authority, Construction may allow. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
21.
|
3-2.6 |
Period of Approval a)
After the receipt of an application for approval
of building plan the Authority shall examine and shall approve or reject
within 30 days category I & II and 45 days for category III & IV.
Appropriate action shall be taken against the concerned officer under E&D
rules if the case is not finalised within the period specified above b)
In the case
of refusal / rejection explicit objection will be communicated in writing
quoting provision of the regulations. If the applicant complies with the
specific objections communicated earlier within a period of one year no
further scrutiny fee shall be charged. c)
Upon
approval of the submission construction should be commenced within a period
of one year failing which renewal of permission to construct shall be
obtained from the Authority. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
22. |
3-2.11 |
Floor
Certificate For Category “III” and Category
“IV” buildings, the owner and
Professionals shall submit to the Authority floor certificate (Form ZP-5) casting of
slab of each floor, certifying that
all the building line and structural members on the said floor
are in conformity with the design as
approved by the Authority subject to clause 3-2.4 and 3-2.5. If the owner/professional fails to
submit the floor certificate the authority shall stop further construction
work |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
23. |
3-2. 13 (b) |
Contravene any of the provisions of the
existing Regulations or any statute, it may, by written notice (ZD-6), require the person and
the Professional carrying out
building works within the
period to be specified in such
notice, with the object of
bringing the works in conformity with the said plan, approved
specifications, or provision of these Regulations, to get revised submission
plans approved after complying with the requirements of these
Regulations. In the case of Category
“IV” Building, the notice will be issued after personal inspection by at
least a Deputy Controller of
Buildings. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
24. |
3-2.15.2 |
In case building work is
completed in all respect but the utility services are not provided by the
utility agencies despite the payment of estimate by the developer / owner in
public sale buildings / projects, in such cases the completion plan /
provisional occupancy certificate shall be issued on the basis of provision
of services as provided in clause 5-1.20.2 of these Regulations. The provisional occupancy
certificate will automatically be deemed final, as soon as the connection of
utilities by utility agencies have been provided. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
25. |
FORM ZP-8 Point No.9 |
Deleted |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
26. |
FORM ZP-8 Point No. 11 Sub Para 3 |
I/We -------------------- undertake
to observe and proper precautions as prescribed under the relevant concerned
utility agencies and the KB&TP Regulation is in vogue to ensure safety of
the public, of persons employed at the site and of adjacent buildings. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
27. |
3-2.18 |
Permit
to Demolish Buildings. No building may be demolished
without written permission from the Authority on a prescribed form(ZD-10).
No permit to demolish will be
issued unless the
Authority is assured by the applicant through an undertaking that the
electricity, gas, water, sewerage or
other utility services connections to
the building or portion to be demolished
shall be effectively cut
off or relocated and such connections shall remain
cut off/ relocated during the period of the work in case of
any adverse eventuality the owner / contractor shall be fully responsible. The Authority shall
reject/approve application for demolition within 15 days from the date of
submission. In case of refusal by the Authority the rejection letter shall
specifically cite the relevant clauses etc. All applications for a permit to
demolish a building shall be made on appropriate form (ZP-8) and permission to demolish by the Authority shall
be issued on appropriate form (ZD-10). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
28. |
Schedule 3A Scrutiny Fee |
Scrutiny Fee to be charged shall be
as prescribed and revised from time to time by the Oversee Committee. The Scrutiny Fee for revised/amended plan
shall be charged at rate of 50% of the original fee. However full fee shall
be charged for covered area in excess of the area originally approved. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
29. |
SCHEDULE 3C PUBLIC NOTICE FOR CHANGE OF LAND USE |
Condition |
Current
|
Converted |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Total Floor Area |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Deleted |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Deleted |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Deleted |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Usage of Building |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
30. |
Chapter 4 |
LICENSING / ENLISTMENT OF
PROFESSIONALS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
31. |
4-1.1 Architect |
A professional recognised as such
under PCATP Ordinance-ix of 1983 and Rules & Regulations framed
thereunder |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
32. |
Professional Engineer (Civil) |
A professional recognised as such
under PEC Act and Rules & Regulations framed there under. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
33. |
Proof Engineer |
A professional registered with PEC as
consultant and enlisted by the Authority as per clause 4-12 and with a
minimum of 10 years experience of Structural Design. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
34. |
Town Planner |
A professional recognised as such by PCATP Ordinance ix of 1983 and Rules & Regulations framed thereunder. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
35. |
4-1.3 |
Propose Title. ”Qualification/
Enlistment of Laboratories”. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
36. |
4-2 |
Manner of Enlistment / Licence. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
37. |
4-2.1 |
To be read as “Authority for
enlistment /licence”. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
38. |
4-2.2 |
The qualifications and
experiences required for licence in a particular category shall be as required
in these Regulations. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
39. |
4-3.1 |
The application for grant of licence
to non-professional or firm shall be considered by a Committee consisting of: |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
40. |
4-3.1.2(f) |
Association of Builders and
Developers - member |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
41. |
4-5 |
Registration / Enlistment and
De-Registration/ De-Enlistment |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
42. |
4-5.2 |
Committee member felt that in
light of promulgation of Pakistan Council of Architect & Town Planner Ordinance
subsequent, SBCO and this clause it was decided that this matter be referred
to Govt. of Sindh for reconciliation. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
43. |
CHAPTER 5 PUBLIC SALE PROJECTS |
Word “Developer” to be read as ”Builder” |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
44. |
5-1 |
NO OBJECTION
CERTIFICATES FOR SALE OF UNITS IN BUILDINGS All buildings having 3 or more units (residential, commercial, amenities) to be constructed for onward transfer of title in piece meal (in the form of sub lease etc.) are bound to obtain NOC for sale from the authority in accordance with these regulations. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
45. |
5-1.4 |
Determination
of Price and Cost Estimate. A developer shall submit the
Selling Price of various units for registration purposes with details specification
and work program for the project as specified in Form DNP-I Annexure (3)
& (4) respectively. Bill of Quantities shall not be required to be
submitted. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
46. 47. |
5-1.6.1 5-1.6.2 |
The Builder shall deposit a security,
in the form of a bank guarantee / cash deposit equalling 1% of the cost of
construction to be held in a separate account which shall be utilized as
defined in Clause 5-1.6.3. In addition, in case of delay in completion of the
project, where such delay has not been condoned as per clause 5-1.18.,
deduction from the security deposit shall be made in proportion to the extent
of the delay. This amount or lesser amount shall be refunded on the
successful completion of the project and after approval of completion plan,
obtaining the Occupancy Certificate and the expiry of the maintenance period
as enunciated in the NOC granted by the Authority. The 1%
security deposit will be paid in two (2) equal instalments as under: i)
At the time
of collection of the NOC for sale. ii)
On the approval but before collection of plinth certificate |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
48. |
5-2.5. Security
Deposit |
5-2.5.1 Developer
shall mortgage 15% of the plots in favour of Approving Authority under section
5 of SBCO as security deposit. In case of delay in completion of the project
where such delay has not been condoned as per clause 5-2.16. These mortgage plots or part
thereof shall be refunded on successful completion of the project and after
obtaining occupancy certificate and expiry maintenance period as enunciated
in the NOC granted by the Authority. 5-2.5.2 Deleted |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
49. |
8-8 |
Filling of Excavated Site A site once excavated shall not kept open and idle for a period beyond six months, failing which the Authority shall not revalidate the building plans and shall inform the Concerned Authority for further appropriate remedial measures. In case of any mishaps the owner shall be responsible for life and property of the affectees. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
50. |
9-5.3 |
Open balconies projecting on to
public streets from buildings abutting such streets shall be permitted by the
authority only for residences/apartments. Such
projection shall not be used as a room
as per conditions stated here under: |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
51. |
Table Column No.3 Row No.1 |
To be read
as “Maximum Projection of Balconies” |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
52. |
9-6.5 |
The minimum clear height of rooms shall be as per table below: Habitable rooms 9.5 ft.(2.65m) Kitchens 8 ft(2.43m) Bathrooms, W.C.’s, Latrine 8 ft.(2.43m) Garages and Car porch 7.5 ft.(2.28m)
Passages, galleries, corridors 7.5 ft.(2.28m) |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
53. |
9-8.1. |
Staircases The riser of all buildings shall not
be more than 7 inches (18 cm) and the tread shall not be less than 10 inches (25
cm) except for houses where the maximum riser shall be 7 inches (18 cm) and
the minimum tread will be 9 inches (23 cm). Stair cases to lofts and spiral
stair case to non public access areas shall be excluded from these
requirements. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
54. |
9-9
Lifts |
Wherever required under these
regulations, no lift will be of capacity less than 6 person, and lifts shall
conform to the technical provisions
of BS5655 with respect to all safety devices, procedures of examination and annual
testing/certification of lifts by a professional engineer of concerned
disciplines. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
55. |
9-12 |
Compound
Wall Compound Wall wherever
constructed shall be limited to max. height of 8´-0” (2.44 M) above the crown
of road. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
56. |
9-13 Facilities for disabled |
In all buildings
intended for commercial use, public use and
buildings meant for amenity purposes such as health & welfare
uses, education uses, religious uses, recreation uses and govt. uses shall provide facilities for disabled persons as under:- 9-13.1
Provision of ramp upto ground floor with a minimum width of 4 ft. (1.20m) and
maximum gradient 1:12 with a railing at least on one side. 9-13.2
Minimum one
toilet designed for person on a wheel-chair with adequate safety provisions
such as grab bar, rails etc., and locking provision that can also be operated
from out side. 9-13.3
Provision
for parking reserved for disabled persons as noted in clause No. 24-2.6 |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
57. |
10-8.5 |
Deleted |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
58. |
12-7.4 |
In an office with upto 20(twenty) persons (calculated at a rate
of one(1) person per 120Sqft.(11.15 Sq.m), there shall be minimum of two (2)
W.C.’s, two(2) washbasins. For every additional 20 (twenty) persons or part
thereof there shall be one(1) W.C., one(1) wash-basin. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
59. 60. 61. 62. |
13-2.1.3(f) 14-5.3 15-3.2 15-3.2.1 15-3.2.2 15-3.2.3 15-3.2.4 |
The stand pipes shall be fed by water reserved for this purpose as per clause Nos.12-2 with a minimum of 7ft.(2.1m) head above the discharge point. Dividing all
buildings except industrial building, into smaller compartments of an area
not exceeding 25,000Sq.ft.(2323 sq.m). In the event that there is open
space at rear of the declared heritage building, additional construction in
the open space may be allowed within allowable FAR and the owner of the plot
shall ensure that the existing heritage building will be protected and
maintained. Deleted Deleted Deleted Deleted |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
63. |
15-3.2.1 in line No. 3 in line No.4 |
For word “owing” to be read “ zoning” For word “accept” to be read “except” For word “fro” to be read “for “ |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
64. |
16-2.5 |
The required COS shall be measured
from the property line, In the event of building line is required to be set
back on account of road widening greater than the required COS, no further
COS will be required. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
65. |
Schedule 17A |
Deleted |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
66. |
18-1.1 |
Major Sub-division means any
sub-division of 5.0 or more acres (2 hectares), or any size sub-division
requiring a new street or road, or the extension or addition of substantial
new public facilities. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
67. |
18-1.2 |
“Minor sub-division” means any sub-division of less than 5.0 acres (2 hectares) on an existing street, not involving any new street or road or the extension of or addition of substantial new public facilities. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
68. |
18-3.1.3 |
Sub-division of residential plots will only be considered to the extent that sub-divided plot shall not be less than 400Sq.yds.(336.13 Sq.m). |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
69. 70. 71. 72. 73. |
18-3.1.4 18-3.1.6 18-3.1.7 18-3.2.1 18-3.2.1-A |
Sub-division
of commercial plots will only be considered to the extent that sub-divided
plot shall not be less than 725 sq.yds.(609.41Sq.m). having a minimum frontage of 60ft.(18.27m). The FAR
of the original plot, COS and Foot Print of the revised plot shall be
allowed. Deleted No sub-division of a plot shall be considered without each of the sub-divided plots having direct approach/es from a planned road / street / lane or approach provided by the plot owner from his own land upto a minimum of 16 ft. (4.87 M) width. “Amalgamation of Residential, Commercial, Industrial and Amenity plots shall be allowed subject to a maximum area not exceeding four times the area of the larger plot of the category concerned provided land grant/allotment conditions of the plots are similar and on payment of fees as may from time to time be determined by the CDGK”. Seven copies of proposed amalgamation plan shall be submitted with the signature of Architect/Town Planner and owner for approval. Deleted |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
74. 75. |
18-3.1.8 18-3.1.10 line No. 1 |
Building
regulations of the original category of the plots shall be applicable to the
subdivided plots. However a five feet (1.5m) minimum open space shall be
provided on both sides of the sub-dividing lines. To be read “Old Clifton” |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
76. 77. 78. |
18-3.2.2 18-4.2.8 18-4.2.10 |
For residential, Industrial and Amenity plots:
Regulations of new i.e respective category of plot shall be applicable. For Commercial plots, regulations of the new category of plot shall be applicable. However the increase of FAR due to increased size of plot, shall be allowed to the extent of 50% of the FAR applicable to the original plot, or 1:5.5 whichever is less. Where there is no similar category of plots, the terms and conditions shall be determined by the Master Plan Group of Offices. Residential plot within a
residential neighbourhood can be allowed to be used for Education provided
the plot faces minimum width of road 60 ft. and lawfully converted into an
Amenity plot for education by the MPGO as per prescribed procedure after
inviting public objection from neighbourhood. Any particular individual industrial plot surrounded by planned residential/flats/commercial area may be allowed to be converted into residential/ flats/ commercial plots. The fees charged will be same as those applicable to the nearest declared commercial road. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
79. |
18-4.3 |
Deleted
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
80. 81. 82. 83. |
19-2.2.3 19-2.2.6 .(e) 19-3.4.6 20-1.1.2 20-1.1.3 20-1.1.4 20-1.1.5 |
Deleted
lodging: including hotels,
motels, guest houses and clubs providing lodging; Communication: including Radio, TV,
communication towers, wireless stations, boosting stations and telephone
exchanges etc. Plot area of ‘R’ category shall be 120 sq. Yds. (100.33 sq. m). plot area of ‘A’ category shall be 240 sq. Yds. (200.67 sq. m). plot area of ‘B’ category shall be 400 sq. Yds. (334.45 sq. m). plot area of ‘C’ category shall be 600 sq. Yds. (501.67 sq. M) Note: in case of corner plots, irregular plots or on account of any
other physical constraint, deviation of size upto ± 20 % shall be allowed. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
84. 85. 86. 87. 88. |
20-4.1.3 20-4.2.4 21-2.2 21-4.2 21-6.1 |
Amenity area for other residentiary uses shall be as under:- a) Roads/Streets, right of way minimum 25%
of the total area of the land. b)
Parks and playground minimum 8% of the total area of the land. c). Public Uses including Religious Building
and Health Centre uses etc. minimum
4% of the total area of the land. d) Educational uses minimum 3% of the
total area of the land. e). Deleted On industrial plots of 5 acres and more, 8% of the total plot area in the rear shall be allowed for residential, local commercial, amenity, road etc. within the premises for labour and staff for which a separate approach shall have to be provided. The minimum distance between the factory and residential units shall be atleast 40 ft. (12.18 m.) Minimum width of street shall be 24 ft. (7.31 m) with kerb side parking on one side only.
The width of side walks (a)
shall depend on the pedestrian traffic volume. However, minimum width of side
walk shall be 3 feet (0.900 M) Street
right-of-way shall be regarded as distance between plot lines on opposite
side of the street. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
89. 90. 91. 92. |
23-3.1.2 23-4 23-4.2.4 23-5.3.5 |
Word
“roasting” to be read “roosting” Word “aras” to be read “areas” Word “pairs” to be read “piers”Word “dolphine” to
be read “dolphin” |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
93. 94. 95. 96. 97. 98. 99. 100. 101. |
24-2.6 24-3.1 24-3.2 24-3.3 24-4.1.5 24-4.1.6 24-4.1.10 24-4.1.11 24-4.1.12 |
Minimum one out of every 50 car
parking stalls or less as required by these regulations shall be dedicated
for the disabled persons at most convenient location. car lifts shall not be allowed
as means of access for car parking required as per these regulations ramp as
per standard noted in clause 24-6 shall be provided. Deleted Deleted every
2000Sq.ft.(185.87Sq.m) of floor area of office space in an industrial
building unit. 24-4.1.6 every 800Sq.ft(75Sq.m) of floor area of space for retail
shopping in categories of properties AI & I; 24-4.1.6.1
every 1000Sq.ft (93Sq.m) of floor area of space for retail shopping in
categories of properties II & III; 24-4.1.6.2
every 1200Sq.ft(111.5Sq.m)of floor area of space for retail shopping in
categories of properties IV, V & VI; categories of area as notified by
Board of Revenue Govt. of Sindh in its collector table every
60Sq.yds.(50.4Sq.m) of marriage lawn/hall of minimum plot area of 1000 Sq.
Yds. (840.33m). 24-4.1.11
apartment building, or residential-cum-commercial building for every 1200Sq.ft. (111.52Sq.m)
categories I & IA 24-4.1.11.1 for
every 1400Sq.ft.(130.11Sq.m) categories II & III 24-4.1.11.2
for every 1600Sq.ft.(148.68Sq.m) categories
IV, V & VI for floor areas of only residential
use. Categories of area as notified by
Board of Revenue Govt. of Sindh in its collector table whereas commercial use areas shall be
governed by relevant rules; every
300Sq.ft.(27.88Sq.m) of floor area of Cinema. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
102. |
Table – 24.1 Column No.1 Row No.5 Line No.2 |
Word “Helical length” to be read
“Helical ramp” |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
103. |
24-5.1 |
In the case of land
development, structure or facilities where uses do not fit the categories given
above, the agency determining an application for a development permit may
require the provision of parking spaces to the extent reasonably necessary to
promote any of the purposes. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
104. |
24-5.2 |
In addition to the foregoing
requirements the authority determining an application for a development
permit shall require the provision of off-street parking spaces for all motor
vehicles, including trucks, fork lifter etc. and any animal-drawn vehicles
essential for the operation of facilities or enterprises on the premises, and
the provision of adequate loading and unloading facilities for industrial
unit for supply vehicles so located as to cause the least possible
obstruction to the pedestrians. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
105. |
Table 24.2 |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
106. |
24-7.4 |
Educational buildings
of low income area/groups. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
107. |
24-7.5 |
Orphanage house,
buildings for destitutes or similar use. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
108. |
24-8 |
Deleted |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
109. |
25-1.2.1(a) |
From 30ft.(9.0m) to
59ft.(17.9m) width of the road, the distance should be 8ft.(2.44 m); |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
110. |
25-1.2.1(b) |
From 60ft.(18m) to
109ft.(33.22m) width of the road, the distance should be 10ft.(3m); |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
111. |
25-1.2.1 (c) |
From 110ft.(33.53m)
and above width of the road, the distance should be 12ft.(3.65m); |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
112. |
25-1.2.1(e) |
In case of plot area upto 120 Sq.
Yds. abutting on two roads of two different width, the required chamfered on
both sides shall be governed by width of smaller road. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
113. |
25-1.2.1(f) |
The length of chamfered portion noted
above shall be in accordance with
width of the respective road and shall be measured along the length of
the road. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
114. |
25-1.4.2 |
Deleted – Refer clause
No.25-1.7.2 below |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
115. |
25-1.4.4 |
Deleted - Refer
clause No.25-1.7.3 below |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
116. 117. |
25-1.5 25-1.5.1 25-1.5.2 |
Space
between blocks in Residential Plots. In case where a number of
Blocks are designed within the plot boundary, open space between two blocks
on front and rear sides of the blocks shall be 50% of the height of the block
with minimum 24ft.(7.31m) and minimum open space between the blocks on other
two sides of the blocks shall be 20% with
minimum 15ft.(4.56m) of the height of the block as illustrated in
FIGURE-4 & FIGURE-5. wherever
more than one residential buildings / town houses are permitted within the
plot boundary, for buildings of maximum two storeys height open space on
front and rear of the building shall be minimum 15ft. (4.56m) and minimum open space between the
buildings on sides of the buildings shall be
minimum 7ft.(2.1m). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
118. |
25-1.6.2 |
For all public sale/public
use/industrial and commercial plots exceeding 600Sq.yds.(502Sq.m) a minimum
of 2% of the permissible floor area ratio/ proposed covered area shall be provided
for recreation facilities/children play area/prayer area. This area shall not
be included in the total floor area up to a maximum of 2% of total floor
area. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
119. |
25-1.7.2 |
Staircase tower over the stair shaft
shall be allowed with maximum clear height of 10ft.(3m). This area shall not
be included in FAR. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
120. |
25-1.7.3 |
The loft area upto
a maximum height of 5ft.(1.52m) on bathroom and kitchen shall not be included
in FAR. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
121. |
25-1.9.1 |
In case of plots of non
rectangular shape, COS on respective side/s shall be measured as average
space between buildings and property line with minimum of 5 ft. (1.5m). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
123. 124. |
25-2.1 25-2.2.2 |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Height of all houses/bungalows
measured from Plinth level, but excluding parapet, overhead tank, lift
machine room if required, staircase tower, and barsati, shall not exceed 35ft.(10.66m) or three stories whichever is
less upto plot area 399 Sq. Yds. (335.2m2) and 25ft. (7.61m) or
two stories whichever is less for plot area of 400 Sq. Yds. (336 m2)
and above, (except for category `G` plot of 3347.55 Sq. Yds. to 4064.89 Sq.
Yds. (2800 m2 to 3400 m2
) where the height of 50 ft. or four storeys whichever is less be
allowed and for category H – plots of 4000 sq.yds and above where height of
72 ft or 6 stories whichever is less will prevail). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
125. |
25-2.2.3 |
Plots abutting a public street,
lane and permanent open space on the rear shall be exempted from the
provision of rear COS up to Plot size of 119Sq.yds. (100Sq.m). For plots
greater than 119Sq.yds.(100Sq.m), the rear COS shall be 50%. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
126. |
25-3.1 |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
127. |
Other Conditions 25-3.2 (1) |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
128. |
Other Conditions 25-3.2 (4). |
Arcade on front/sides
not required if building line set back 8ft(2.5m) or more from the property
line. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
129. |
Other Conditions 25-3.2 (5). |
Wherever minimum COS on sides
and rear is specified in relation to height of building, the COS shall be
equal to 10% of building height above ground floor but subject to maximum of
15% of the plot width/depth on each side/rear respectively, but with minimum
as prescribed. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
130. |
25-5 |
Deleted |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
131. |
25-6.5 |
Word “section 25-6.11” to read as
“Section 25-6.12”. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
132. |
25-9.2(e) |
Deleted |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
133. |
25-9.6.3 |
For building facing road/street
less than 30ft.(9.13m) in width; a minimum distance of 15ft.(4.5m) from
centre of the road/street measured at right angles to the face of the
building shall be maintained. In case of a plot abutting on road/street on
more than one side, then this rule shall apply for all such sides of the
plots. (This requirement shall not be applicable in Lines Area (Scheme No.35)
on plots whose depth is less than 35 ft. (10.66 m).) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
134. |
25-9.6.6 |
For all residential plots
facing more than 30ft.(9.13m) road / street width, the minimum COS and foot
print as prescribed in Section 25-2 shall be applied subject to clause No.
25-9.3 except the part of old city including following area. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
135. |
25-9.6.9 |
The required COS shall be
measured from the property line, in the event of building line is required to
be set back, on account of Clause No. 25-9.6.3, greater than the required
COS, no further COS will be required. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
136. |
25-10.2.5 |
No cinema shall be planned within
700ft.(213.21m) of any mosque, religious building, hospital, public building
or school. Provided that these buildings have been constructed on plots
originally designated as such in the approved layout plan. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
137. |
25-11.4 |
A petrol station
may not be located within 0.46mile (0.75km) of the site of an existing or
approved petrol station unless the petrol station and the other such site or
sites are located on the opposite side of a street having a right-of-way of
not less than 100ft.(30m) and a dividing median strip. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
138. |
25-11.10 |
Petrol
Station can be allowed on commercial and industrial plots after conversion into
specific designated petrol pump plot provided all other requirements noted
above are met and after calling of public objections through press and with
the approval of MPGO on payment of prescribed fees and charges. a).
For commercials plots @Rs.1000/-per
Sq.yd. (Rs.1196/- per Sq.m) b). For industrial plot @Rs.3000/- per
Sq,.yd. (Rs.3588/-per Sq.m). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
139. |
25-11.13 |
Deleted |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
140. |
25-13.2 |
A Maximum of 5% of FAR
may be utilized for commercial activity for generating income/fund for
maintenance of religious building. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Chief
Executive KBCA
(Authority
as per SBCO 1979)
1.
The Secretary Local Government.
2.
The Senior Member Board of Revenue, Sindh, Karachi
3.
The Chairman, Anti-corruption Establishment Wing, S&GAD, Karachi
4.
The EDO(Water & Sanitation)
5.
The EDO(Revenue)
6.
The CCOB, KBCA, Karachi.
7.
All Town Nazim, CDGK
8.
The Director Information, Govt. of Sindh, Karachi.
9. Superintendent, Sindh
Govt. Printing Press, Karachi with the request to please publish the above in
the gazette of notification.
Sd/-
[S. MUKARRAM SULTAN BUKHARI ]
DISTRICT
OFFICER
FOR DCO, CDGK


<